Parcel 001-221-03
Owners
EUREKA COUNTY (FAIR GROUNDS)
PO BOX 677
EUREKA, NV 89316-0677
Parcel Summary
| Location | 1051 N MAIN STREET EUREKA, NV |
|---|---|
| Use Code | 440: Commercial Recreation |
| Tax District | 1.0: Eureka Town District |
| Acreage | 27.5500 |
| Section | 11 |
| Township | 19 |
| Range | 53 |
| Exemptions | 361.060A: COUNTY OWNED (100%) |
Keyline Description*
W2NW4NE4;W2E2NW4NE4less 6.08Ac HWRR
Patent Number 27-97-0009 from the USA
Changed from Parcel #008-070-08
*For Assessor Use, not an official legal description.
Value History
| 2026 | 2025 | 2024 | 2023 | 2022 | 2021 | 2020 | |
|---|---|---|---|---|---|---|---|
| Total Building Value | $114,671 | $119,127 | $128,120 | $116,392 | $649,111 | $608,709 | $597,217 |
| Total Extra Features Value | $616,688 | $656,451 | $657,499 | $603,457 | $0 | $0 | $0 |
| Total Secured Pers Prop | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| Total Land Value | $204,013 | $204,013 | $204,013 | $204,013 | $204,014 | $204,014 | $204,014 |
| Taxable Value | $935,372 | $979,591 | $989,632 | $923,862 | $0 | $0 | $0 |
| Net Exemptions Value | $327,380 | $342,857 | $346,371 | $323,352 | $298,594 | $284,453 | $280,431 |
| Net Assessed Value | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| New Improvements | $0 | $0 | $0 | $0 | $8,631 | $0 | $0 |
| New Land | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
Document/Transfer/Sales History
Buildings
Building # 1, Section # 1, OPEN PAVILION, Pavilion NoEW
Extra Features
| Code | Description | Length | Width | Units | Unit Price | AYB | Repl Cost | % Good Condition | Dpr Value* | Final Value | Alt Dscr |
|---|---|---|---|---|---|---|---|---|---|---|---|
| ENGBLDG2 | PRE-ENG STEEL BLDG,USED 1.5 LEN TO WIDTH | 40 | 80 | 3200.00 | $37.44 | 1991 | $119,814 | 46% | $55,114 | $55,114 | FAIR BUILDING |
| CAWNING1 | COMM'L AWNING CLASS 1(MTL),CLASS 2 (WD) | 22 | 80 | 1760.00 | $25.18 | 1995 | $44,317 | 52% | $23,045 | $23,045 | AWNING AT FAIR BUILDING |
| SHED1CFW3 | SHED TYPE 1 W/ CFW | 8 | 40 | 320.00 | $27.82 | 1991 | $8,904 | 46% | $4,096 | $4,096 | MTL STRG CONTAINER |
| SHED1CFW3 | SHED TYPE 1 W/ CFW | 8 | 40 | 320.00 | $27.82 | 1991 | $8,904 | 46% | $4,096 | $4,096 | MTL STRG CONTAINERS |
| BKBBQ | BRICK BBQ SIMPLE CONSTR AVERAGE COST | 1.00 | $1,814.78 | 1991 | $1,815 | 46% | $835 | $835 | BRICK BARBECUE | ||
| CMCFW | COMM'L CONCRETE FLAT WORK 4" UNREINFORCE | 15 | 12 | 180.00 | $11.61 | 1991 | $2,090 | 46% | $961 | $961 | CONCRETE FLAT WORK |
| GRANDSTAND | GRANDSTAND BLEACHERS,OPEN STL, 1000 SEAT | 1440.00 | $116.69 | 2011 | $168,034 | 76% | $127,706 | $127,706 | BLEACHERS (COVER COSTED SEPARATELY) | ||
| BLEACHERRF | ROOFED AREAS AT GRANDSTAND, PER SQ FT | 1440.00 | $25.91 | 2011 | $37,310 | 76% | $28,356 | $28,356 | COVER AT BLEACHERS | ||
| ENGBLDG2 | PRE-ENG STEEL BLDG,USED 1.5 LEN TO WIDTH | 24 | 24 | 576.00 | $42.19 | 1986 | $24,300 | 39% | $9,356 | $9,356 | CONCESSION STAND |
| BLEACHER | PORTABLE BLEACHERS, STL FR, MTL,PER SQFT | 1400.00 | $32.60 | 1984 | $45,640 | 36% | $16,202 | $16,202 | BLEACHERS, 7 TOTAL | ||
| CHAIN6 | CHAIN LINK FENCE W/ TOP RAIL, 2" MESH,6' | 720.00 | $34.42 | 1962 | $24,782 | 25% | $6,196 | $6,196 | CHAIN LINK W/ RAILING | ||
| HC | HAND COSTED | 1.00 | $28,634.00 | 1976 | $28,634 | 25% | $7,159 | $7,159 | BUCKING CHUTE | ||
| ROPECHUT | ROPING CHUTE FIRST SECT W/ RELEASE GATE | 1.00 | $3,521.00 | 1976 | $3,521 | 25% | $880 | $880 | CALF ROPING CHUTE | ||
| CHUTESTRP | COMM'L STRIPPING CHUTE | 1.00 | $1,999.00 | 1976 | $1,999 | 25% | $500 | $500 | UNSADDLING CHUTE | ||
| CHUTE4 | SOLID HEAVY CHUTE, PER LINEAR FOOT | 10.00 | $94.45 | 1985 | $945 | 37% | $349 | $349 | UNLOADING CHUTE | ||
| SHED1CFW2 | SHED TYPE 1 W/ CFW | 13 | 20 | 260.00 | $24.41 | 1993 | $6,346 | 49% | $3,109 | $3,109 | ANNOUNCER STAND |
| SHED1CFW1 | SHED TYPE 1 W/ CFW | 4 | 8 | 32.00 | $32.74 | 1981 | $1,048 | 31% | $325 | $325 | TIMER'S BOOTH |
| ROPECHUT | ROPING CHUTE FIRST SECT W/ RELEASE GATE | 1.00 | $3,521.00 | 1984 | $3,521 | 36% | $1,250 | $1,250 | CALF ROPING CHUTE | ||
| HC | HAND COSTED | 4.00 | $4,194.00 | 1984 | $16,776 | 36% | $5,955 | $5,955 | ROPING BOXES | ||
| WDDECK2 | WD DECK W/ STEP & RAIL | 4 | 20 | 80.00 | $92.58 | 1984 | $7,406 | 36% | $2,629 | $2,629 | CAT WALK |
| FOOTBALL | ATHLETIC FIELD LIGHTING, HIGH,MINIMUM | 1.00 | $392,616.00 | 1990 | $392,616 | 45% | $174,714 | $174,714 | RODEO GROUND LIGHTING | ||
| METAL6 | 6' METAL PANELS, MEDIUM DUTY, EACH | 6.00 | $235.00 | 1984 | $1,410 | 36% | $501 | $501 | PR PANELS, AT RODEO ARENA | ||
| METAL6 | 6' METAL PANELS, MEDIUM DUTY, EACH | 2.00 | $235.00 | 1984 | $470 | 36% | $167 | $167 | 4' PR PANELS @ RODEO ARENA | ||
| METAL8 | 8' METAL PANELS, MEDIUM DUTY, EACH | 2.00 | $239.00 | 1984 | $478 | 36% | $170 | $170 | 8' PR PANELS | ||
| META10 | 10' METAL PANELS, MEDIUM DUTY, EACH | 32.00 | $268.00 | 1984 | $8,576 | 36% | $3,044 | $3,044 | 10' PR PANELS | ||
| META12 | 12' METAL PANELS, MEDIUM DUTY, EACH | 9.00 | $291.00 | 1984 | $2,619 | 36% | $930 | $930 | 12' PR PANELS | ||
| META12 | 12' METAL PANELS, MEDIUM DUTY, EACH | 336.00 | $291.00 | 1994 | $97,776 | 51% | $49,377 | $49,377 | 12' PR PANELS | ||
| META16 | 16' METAL PANELS, MEDIUM DUTY, EACH | 91.00 | $393.00 | 1984 | $35,763 | 36% | $12,696 | $12,696 | 16' PR PANELS | ||
| METAL6 | 6' METAL PANELS, MEDIUM DUTY, EACH | 8.00 | $235.00 | 1984 | $1,880 | 36% | $667 | $667 | 3' PR PANELS, LEVER LATCH | ||
| METAL6 | 6' METAL PANELS, MEDIUM DUTY, EACH | 3.00 | $235.00 | 1984 | $705 | 36% | $250 | $250 | 4' PR PANELS, LEVER LATCH | ||
| METAL6 | 6' METAL PANELS, MEDIUM DUTY, EACH | 15.00 | $235.00 | 1984 | $3,525 | 36% | $1,251 | $1,251 | 6' PR PANELS | ||
| META12 | 12' METAL PANELS, MEDIUM DUTY, EACH | 20.00 | $291.00 | 1984 | $5,820 | 36% | $2,066 | $2,066 | 12' PR PANELS, LEVER LATCH | ||
| META16 | 16' METAL PANELS, MEDIUM DUTY, EACH | 2.00 | $393.00 | 1984 | $786 | 36% | $279 | $279 | 16' PR PANELS, LEVER LATCH | ||
| WTRTNK3 | WATER TANK 500 GALLONS | 4.00 | $500.00 | 1984 | $2,000 | 36% | $710 | $710 | STOCK WATER TANK | ||
| PIPEFL | 4" PIPE, 2" PIPE RAILS, LOW | 251.00 | $19.49 | 1992 | $4,892 | 48% | $2,324 | $2,324 | WARM UP CORRAL | ||
| FENCEL | LOW COST WIRE FENCING | 810.00 | $3.88 | 1994 | $3,143 | 51% | $1,587 | $1,587 | HOLDING PEN | ||
| FENCEL | LOW COST WIRE FENCING | 5573.00 | $1.94 | 1993 | $10,812 | 49% | $5,298 | $5,298 | PERIMETER OF PROPERTY FENCING | ||
| MTLSIGN | METAL, PAINTED, 2 SIDED SIGNS | 19 | 12 | 228.00 | $99.09 | 1999 | $22,593 | 58% | $13,104 | $13,104 | SIGN |
| SEPTK1 | SEPTIC TANK 1000 GALLON | 1.00 | $4,456.25 | 1985 | $4,456 | 37% | $1,649 | $1,649 | SEPTIC SYSTEM | ||
| LOADDKHV | LD DOCK, TIMBER PIER, HVY WD FLOOR | 16 | 32 | 512.00 | $32.97 | 1991 | $16,881 | 46% | $7,765 | $7,765 | HEAVY LOAD DOCK @ PAVILION |
| CMCFW | COMM'L CONCRETE FLAT WORK 4" UNREINFORCE | 2657.00 | $11.61 | 2011 | $30,848 | 76% | $23,444 | $23,444 | CFW @ BLEACHERS | ||
| PORCHMTL1 | SLAB PORCH W/ MTL ROOF; CLASS 2 W/SCREEN | 27 | 16 | 432.00 | $20.30 | 2011 | $8,770 | 76% | $6,665 | $6,665 | METAL COVER W/ CFW |
| PIPEFA | 4" PIPE, 2" PIPE RAILS, AVE | 27.00 | $20.72 | 2011 | $559 | 76% | $425 | $425 | METAL RAILING @ CONCESSION STAND | ||
| PORCHMTL1 | SLAB PORCH W/ MTL ROOF; CLASS 2 W/SCREEN | 22 | 27 | 594.00 | $20.30 | 2020 | $12,058 | 90% | $10,792 | $10,792 | METAL ROOF W/CFW @ CONCESSION STAND |
Land Lines
Personal Property
None
Disclaimer
All parcel data on this page is for use by the Eureka County Assessor for assessment purposes only. The summary data on this page may not be a complete representation of the parcel or of the improvements thereon. Building information, including unit counts and number of permitted units, should be verified with the appropriate building and planning agencies. Zoning information should be verified with the appropriate planning agency. All parcels are reappraised each year. This is a true and accurate copy of the records of the Eureka County Assessor 's Office as of October 24, 2026.